Design, Supply, Installation & Commissioning of CO Gas Monitors and WinCC SCADA Integration for Coal Bunkers Units 1-6 at Kriel Power Station
Summary · 1 min read
Eskom requires a qualified service provider to design, supply, install, and commission Carbon Monoxide gas monitors for coal bunkers on Units 1 through 6 at Kriel Power Station. The contractor must also connect these monitors to the WinCC SCADA control system within three months.
Do you qualify? 4 requirements found
-
Valid CSD Registration with compliant tax statusMandatory
-
Valid B-BBEE Certificate or Sworn AffidavitMandatory
-
COIDA Registration / Letter of Good StandingMandatory
-
Technical experience in Gas Detection / C&I Engineering and WinCC SCADA integrationMandatory
Documents you must submit
- Completed Invitation to Tender and Returnable Schedules
- Technical Proposal and System Architecture Design
- Proof of experience and past references for similar C&I/SCADA installations
- Safety, Health, Environment, and Quality (SHEQ) Plan
Evaluation criteria
Technical/Functionality threshold, Price and Preference Points System (80/20 or 90/10) based on Eskom Procurement Policy Framework.
Tender documents · 1 file
Also available: submission address & procurement contact-
Tender DocumentsDocument · FILESign up to download
Free to sign up · Already have an account? Sign in
Similar tenders closing soon
All Equipment, Machinery and Tools tenders →-
1 day left
Assessment and Repair of 3 Wacker Neuson Equipment for Alton Urban Roads Depot
City of uMhlathuze · KwaZulu-Natal -
1 day left
Medupi Power Station Submerged Scraper Conveyor Service (5 Years)
Eskom · Limpopo -
1 day left
Removal, Supply, Installation, and Servicing of Air Conditioning Units for SAMSA Mossel Bay Office (3 Years)