Closes in 24 days SOE Mechanical and Plant Engineering

Engineering Consultancy for Sewerage & Stormwater Pump Systems at OR Tambo Airport

Summary · 1 min read instead of 98 pages

Airports Company South Africa (ACSA) is seeking a professional engineering consulting firm to assess, design, support procurement, oversee construction, and manage close-out for the complete replacement of sewerage and stormwater pumping systems and their control systems at O.R. Tambo International Airport.

Closing
03 Dec 2026 · 12:00Project lifecycle covering assessment, design, procurement, construction supervision, and close-out contract
Location
Gauteng
Published
08 Nov 2026
Documents
2 filesPDF

How it's scored

80 pts Price 20 pts B-BBEE

A valid B-BBEE Level 1 or 2 certificate or sworn affidavit ensures maximum points under the 20-point B-BBEE allocation.

Ideal bidder

An established engineering consultancy firm with ECSA-registered professional engineers possessing proven experience in mechanical, civil, and control engineering for municipal or major infrastructure bulk water, sewage, and stormwater pumping schemes.

Sign up and see plans →

Do you qualify? 6 requirements found

Extracted from the tender documents by AI · check against the official notice
  • Valid CSD Registration Report Must be registered on Central Supplier Database
    Mandatory
  • Tax Compliance Pin issued by SARS Valid tax pin required
    Mandatory
  • ECSA Registration of Lead Engineers Professional Registration with ECSA
    Mandatory
  • Professional Indemnity Insurance cover Proof of PI insurance
    Mandatory
2 more requirements incl. mandatory returnables and evaluation weighting. Unlock the full checklist

Documents you must submit

  • Completed and signed RFQ / Tender Form
  • Valid B-BBEE Certificate or Sworn Affidavit
  • Company Registration / CIPC Documents
  • Curriculum Vitae and ECSA Certificates of Key Personnel
  • Track Record and References of Similar Pumping System Projects

Evaluation criteria

Evaluated based on mandatory administrative compliance, technical functionality threshold, and 80/20 preference point system (Price and B-BBEE status level).

Tender documents · 2 files

Also available: submission address & procurement contact

Free to sign up · Already have an account? Sign in

24 days left · 2 documents

Sign up and see plans